Toll Free Number 1-800-212-2599
   |   +(91-22) 61772000 (25 Lines)
   |   GST ID : 27AAECS6989F1ZS
   |   CIN : U72200MH2000PTC125470

PTTGC plans maintenance at No. 1 cracker

On 08 March 2018 at 08:20 IST

PTT Global Chemical (PTTGC) is likely to take its No.1 cracker off-stream for a maintenance turnaround.

A Polymerupdate source in Thailand informed that the cracker is expected to be taken off-line in early-September 2018. The planned maintenance is likely to remain in force for around 40 days.

Located at Map Ta Phut in Thailand, the cracker has an ethylene production capacity of 460,000 mt/year and a propylene production capacity of 125,000 mt/year.

back to list