+(91-22) 61772000 (25 Lines)
   |   GST ID : 27AAECS6989F1ZS
   |   CIN : U72200MH2000PTC125470

CP Chem undertakes unplanned shutdown at Sweeny cracker

On Thursday, September 16, 2021 at 08:40 IST

Chevron Phillips Chemical (CP Chem), has undertaken an emergency shutdown at its cracker owing to Hurricane Nicholas.

A Polymerupdate source in the US, informed that, the company halted operations at the cracker on September 14, 2021. Further details on duration of the shutdown could not be ascertained.

Located at Cedar Sweeny, Texas, in the U.S., the cracker has an ethylene production capacity of 680,000 mt/year.


back to list

Products